How to install Pipeline of Gas-fired Hot Water Boiler

Gas-fired hot water boiler installation, first of all to choose qualified products, and then according to the steps to properly install and debug, in order to allow the boiler to operate normally, to achieve the desired installation effect and use effect. Here are the main steps to install hot water boiler pipes: How to install Pipeline of Gas-fired Hot Water Boiler 1. Installation of the water supply pipe should start from the pipe end of the equipment and extend outwards based on the pipe joint on the equipment, and pay attention to the installation under the heating pipe. 2. The hot water pipe should be installed. When installing, it should have a certain slope, and the direction is the same as the hot water flow direction. The highest point is equipped with a steam exhaust valve, and the drain pipe is connected to the ground drain. The lowest point is provided with a trap to ensure easy operation. 3. The sewage pipeline installation, the sewage pipeline and the equipment and the valve are flanged, all welded. Use elbows as little as possible on the pipe.

Our Products

Other Application

Online Consultation